Milan's Arena Civica Track Needs \u20ac6 Million Rebuild

Milan's Arena Civica Track Needs \u20ac6 Million Rebuild

milano.corriere.it

Milan's Arena Civica Track Needs \u20ac6 Million Rebuild

The athletics track at Milan's Arena Civica is in need of a \u20ac6 million rebuild due to poor workmanship during a 2020 renovation, causing safety concerns for athletes.

Italian
Italy
SportsItalySafetyAthleticsRenovationSport
Federazione Italiana Di Atletica Leggera MilanoMilan City Council
Tito GilbertiRoberta Guaineri
What is the proposed solution to address the track's issues?
Tito Gilberti, president of the Milan Athletics Federation, believes the track needs a complete \u20ac6 million rebuild. He emphasizes that patching the track is a temporary fix and poses safety risks for athletes.
What is the main problem with the athletics track at Arena Civica in Milan?
The Arena Civica's athletics track in Milan, Italy, is in disrepair due to poor workmanship during its last refurbishment in 2020. Despite costing \u20ac2.5 million, the track quickly deteriorated, requiring constant patching.
What is Tito Gilberti's perspective on the cause of the track's deterioration?
The poor quality of the 2020 track renovation is the main reason for its rapid deterioration, not simply wear and tear from use. Gilberti argues that even with heavy use, a well-constructed track would last much longer.
What are the safety concerns related to the current state of the athletics track?
The deteriorating condition of the track is a safety concern because athletes risk tripping on the damaged surface. This has led to the cancellation of national competitions at the venue.
How much money has been allocated for the renovation of the Arena Civica's athletics track?
The Milan city council is aware of the track's condition and has allocated \u20ac6 million in its 2025 public works plan for a complete renovation, including improvements to the changing rooms and stands.