Showing 1 to 2 of 2 results


Line 5 Tunnel: Environmental Risks Outweigh Spill Prevention, Analysis Shows
The US Army Corps of Engineers' draft environmental impact analysis of Enbridge's proposed tunnel for its Line 5 oil pipeline in the Straits of Mackinac shows that while the project would prevent anchor-caused ruptures, it would also destroy wetlands, harm bat habitats, and cause other environmental...
Line 5 Tunnel: Environmental Risks Outweigh Spill Prevention, Analysis Shows
The US Army Corps of Engineers' draft environmental impact analysis of Enbridge's proposed tunnel for its Line 5 oil pipeline in the Straits of Mackinac shows that while the project would prevent anchor-caused ruptures, it would also destroy wetlands, harm bat habitats, and cause other environmental...
Progress
44% Bias Score

Trump Administration Fast-Tracks Controversial Pipeline Amidst Quid Pro Quo Allegations
The Trump administration is fast-tracking a $1.5 billion Line 5 pipeline replacement project in Michigan, partially contracted to Tim Barnard, a major Trump donor with a history of questionable practices, raising concerns of a quid pro quo and jeopardizing environmental protection.

Trump Administration Fast-Tracks Controversial Pipeline Amidst Quid Pro Quo Allegations
The Trump administration is fast-tracking a $1.5 billion Line 5 pipeline replacement project in Michigan, partially contracted to Tim Barnard, a major Trump donor with a history of questionable practices, raising concerns of a quid pro quo and jeopardizing environmental protection.
Progress
56% Bias Score
Showing 1 to 2 of 2 results