Showing 1 to 1 of 1 results
nrc.nl
🌐 85% Global Worthiness


Tennet Unlocks 9.1 GW of Grid Capacity with New Time-Based Contracts
To alleviate the overcrowded Dutch electricity grid, Tennet introduced a new time-based contract offering off-peak grid access, unlocking 9.1 gigawatts of capacity and partially resolving the backlog of 70 GW in pending applications for new connections, with contracts starting in October.
Tennet Unlocks 9.1 GW of Grid Capacity with New Time-Based Contracts
To alleviate the overcrowded Dutch electricity grid, Tennet introduced a new time-based contract offering off-peak grid access, unlocking 9.1 gigawatts of capacity and partially resolving the backlog of 70 GW in pending applications for new connections, with contracts starting in October.
Progress
40% Bias Score
Affordable and Clean Energy
Showing 1 to 1 of 1 results