Showing 577 to 588 of 1,107 results


Frankenschnellweg Expansion Approved Despite Environmental Concerns
Nuremberg's planned Frankenschnellweg highway expansion overcame final legal challenges after the Bavarian Administrative Court of Appeals rejected the Bund Naturschutz's appeal, with construction starting mid-2027 despite ongoing citizen opposition.
Frankenschnellweg Expansion Approved Despite Environmental Concerns
Nuremberg's planned Frankenschnellweg highway expansion overcame final legal challenges after the Bavarian Administrative Court of Appeals rejected the Bund Naturschutz's appeal, with construction starting mid-2027 despite ongoing citizen opposition.
Progress
48% Bias Score


Badgers Disrupt Dutch Train Services, Costing Millions
ProRail found approximately 500 badger signs near Dutch train tracks in the past two years, causing train delays and costing millions in repairs; the organization is seeking faster permit processes to address the issue while balancing badger protection laws.
Badgers Disrupt Dutch Train Services, Costing Millions
ProRail found approximately 500 badger signs near Dutch train tracks in the past two years, causing train delays and costing millions in repairs; the organization is seeking faster permit processes to address the issue while balancing badger protection laws.
Progress
48% Bias Score


£9 Billion Lower Thames Crossing Approved After 16 Years
The UK government approved the £9 billion Lower Thames Crossing project on Tuesday, a 14.5-mile road scheme aimed at easing congestion on the Dartford Crossing. The project, which includes a 2.6-mile tunnel under the River Thames, has been in planning since 2009, with pre-construction costs reaching...
£9 Billion Lower Thames Crossing Approved After 16 Years
The UK government approved the £9 billion Lower Thames Crossing project on Tuesday, a 14.5-mile road scheme aimed at easing congestion on the Dartford Crossing. The project, which includes a 2.6-mile tunnel under the River Thames, has been in planning since 2009, with pre-construction costs reaching...
Progress
40% Bias Score


Exodigo's AI-Powered Subsurface Mapping Revolutionizes Infrastructure Projects
Exodigo, an Israeli startup, developed AI-powered subsurface mapping technology eliminating the need for excavation. This provides accurate, comprehensive data for infrastructure projects, reducing costs and delays, as used by companies like Israel Electric and the NTA in Israel and HNTB in the US.
Exodigo's AI-Powered Subsurface Mapping Revolutionizes Infrastructure Projects
Exodigo, an Israeli startup, developed AI-powered subsurface mapping technology eliminating the need for excavation. This provides accurate, comprehensive data for infrastructure projects, reducing costs and delays, as used by companies like Israel Electric and the NTA in Israel and HNTB in the US.
Progress
52% Bias Score


Mannheim-Stuttgart Rail Line Closure: 7.5 Million Euro Repairs Due to Tunnel Damage
Due to geological problems in the Freudensteintunnel near Knittlingen, the 99km Mannheim-Stuttgart high-speed rail line will be closed for repairs from April 17th to June 6th, causing delays up to 40 minutes and service cancellations; a €7.5 million repair project is underway.
Mannheim-Stuttgart Rail Line Closure: 7.5 Million Euro Repairs Due to Tunnel Damage
Due to geological problems in the Freudensteintunnel near Knittlingen, the 99km Mannheim-Stuttgart high-speed rail line will be closed for repairs from April 17th to June 6th, causing delays up to 40 minutes and service cancellations; a €7.5 million repair project is underway.
Progress
20% Bias Score


31 Million Euro Temporary Bridge Planned for Bad Schandau After Elbe Bridge Closure
Days before a stress test on Bad Schandau's closed Elbe bridge, planners selected a million euro temporary replacement bridge, to be built this year and opened next year regardless of the test results, minimizing disruption to the town.
31 Million Euro Temporary Bridge Planned for Bad Schandau After Elbe Bridge Closure
Days before a stress test on Bad Schandau's closed Elbe bridge, planners selected a million euro temporary replacement bridge, to be built this year and opened next year regardless of the test results, minimizing disruption to the town.
Progress
40% Bias Score

Greece's Inadequate Border Infrastructure Risks EU Sanctions
The ferry terminal in Bodrum, Turkey, contrasts sharply with the dilapidated Schengen gate in Kos, Greece, highlighting Greece's inadequate border infrastructure; despite handling nearly 700,000 passengers annually from Bodrum alone, Kos's facilities lack modern equipment and sufficient personnel, r...

Greece's Inadequate Border Infrastructure Risks EU Sanctions
The ferry terminal in Bodrum, Turkey, contrasts sharply with the dilapidated Schengen gate in Kos, Greece, highlighting Greece's inadequate border infrastructure; despite handling nearly 700,000 passengers annually from Bodrum alone, Kos's facilities lack modern equipment and sufficient personnel, r...
Progress
56% Bias Score

Ahrtal Tourism Recovery: Slow Progress Amidst Infrastructure Challenges
Nearly four years after the 2021 flood, the Ahrtal valley is rebuilding its tourism sector with €89 million in government funding, reopening 85% of affected businesses, yet full recovery is expected within 8-10 years due to ongoing infrastructure challenges.

Ahrtal Tourism Recovery: Slow Progress Amidst Infrastructure Challenges
Nearly four years after the 2021 flood, the Ahrtal valley is rebuilding its tourism sector with €89 million in government funding, reopening 85% of affected businesses, yet full recovery is expected within 8-10 years due to ongoing infrastructure challenges.
Progress
36% Bias Score

China Seeks New Economic Engines Amidst Infrastructure Dependence
Analysis reveals China's economic growth heavily relied on infrastructure and real estate since 1992, raising concerns about future stability and the need for new growth engines driven by technological innovation and productivity improvements across all sectors.

China Seeks New Economic Engines Amidst Infrastructure Dependence
Analysis reveals China's economic growth heavily relied on infrastructure and real estate since 1992, raising concerns about future stability and the need for new growth engines driven by technological innovation and productivity improvements across all sectors.
Progress
32% Bias Score

Mannheim-Stuttgart Rail Line Closure Due to Tunnel Repairs
The high-speed rail line between Mannheim and Stuttgart will be closed for repairs from April 17th to June 6th, 2024, due to geological issues in the Freudensteintunnel causing delays and cancellations, impacting regional transportation. The Deutsche Bahn is investing €7.5 million in repairs.

Mannheim-Stuttgart Rail Line Closure Due to Tunnel Repairs
The high-speed rail line between Mannheim and Stuttgart will be closed for repairs from April 17th to June 6th, 2024, due to geological issues in the Freudensteintunnel causing delays and cancellations, impacting regional transportation. The Deutsche Bahn is investing €7.5 million in repairs.
Progress
32% Bias Score

Germany Selects Design for 31 Million Euro Temporary Elbe Bridge Replacement
Germany: Planners have chosen a 31 million Euro temporary replacement for the closed Bad Schandau Elbe bridge in Saxony, to be built regardless of an upcoming stress test (April 1-3) on the original bridge, which was closed in November due to cracks after a similar bridge collapse in Dresden. The ne...

Germany Selects Design for 31 Million Euro Temporary Elbe Bridge Replacement
Germany: Planners have chosen a 31 million Euro temporary replacement for the closed Bad Schandau Elbe bridge in Saxony, to be built regardless of an upcoming stress test (April 1-3) on the original bridge, which was closed in November due to cracks after a similar bridge collapse in Dresden. The ne...
Progress
48% Bias Score

Heathrow Airport Power Outage Causes 1,000 Flight Cancellations
A fire at an electrical substation near Heathrow Airport caused a power outage on Thursday, leading to the closure of Europe's busiest airport on Friday, resulting in over 1,000 flight cancellations and affecting approximately 200,000 passengers; the airport reopened on Saturday.

Heathrow Airport Power Outage Causes 1,000 Flight Cancellations
A fire at an electrical substation near Heathrow Airport caused a power outage on Thursday, leading to the closure of Europe's busiest airport on Friday, resulting in over 1,000 flight cancellations and affecting approximately 200,000 passengers; the airport reopened on Saturday.
Progress
24% Bias Score
Showing 577 to 588 of 1,107 results